New Gas Connection: How to Apply and Track Your Application
A new home, a rented house with no gas, or a plot you have just built on: at some point you need a gas connection of your own. Only one company can give it to you, the company that supplies your area, and the process runs through its forms, its survey and its payment letter.
This guide walks through the whole path in plain words. It covers where to apply with SSGC and with SNGPL, the papers that are normally asked for, what a demand notice is, how to follow your application, and the one warning that can save you real money.
The short answer: apply to the company for your area with the application form and your documents. The company surveys your home, then issues a demand notice, which is its official payment letter. You pay that letter at the bank it names, the company lays the service line and fits the meter, and the connection goes live. Keep the receipt or reference number from your application, because that number is how you track everything. Never pay cash to any agent who promises a faster connection.
First, Know Which Company Serves Your Home
Pakistan has two gas supply companies, and each serves its own fixed area. You cannot choose between them. SSGC, Sui Southern Gas Company, serves Sindh and Balochistan, including Karachi, Hyderabad, Sukkur and Quetta. SNGPL, Sui Northern Gas Pipelines Limited, serves Punjab, Khyber Pakhtunkhwa, Islamabad and Azad Kashmir, including Lahore, Rawalpindi, Faisalabad and Peshawar.
Everything in this guide, the form, the office and the helpline, follows from that one fact. If your home is in an SSGC area, every step below happens with SSGC. If it is in an SNGPL area, every step happens with SNGPL.
One Honest Thing Before You Apply: New Connections Run on RLNG
For several years, new domestic gas connections were paused because the country was short of gas. The government lifted that pause in September 2025, and both companies are accepting applications again. But the new connections are not given on the old, cheap system gas.
New connections run on RLNG. RLNG is gas that Pakistan imports from other countries as a liquid, then turns back into gas for the pipelines. Its price is set by OGRA, the gas regulator, and it is revised every month. It costs more than the regular domestic slab rates that older connections pay.
This matters for your budget. The slab rates on our SSGC tariff page and the estimates from our gas bill calculator describe the system gas tariff. A new RLNG connection is billed at the RLNG price instead, so your monthly bills will not match those slab estimates. Ask the company for the current RLNG price when you apply, so the first bill is not a surprise.
What You Will Normally Be Asked For
The exact document list is printed with each company's application form, and the company confirms it when you apply. In practice, applicants are normally asked for the following papers.
- A copy of your CNIC. The connection account is opened in a person's name, and the CNIC is the identity proof for that name.
- Proof that the property is yours, or that you rent it. Owners are asked for their ownership or registry papers. Tenants are asked for the tenancy agreement and a no objection letter from the landlord.
- A recent gas bill of a neighbour, or of the same premises. Where the company asks for it, this bill proves that a working gas supply already reaches your street, and it helps the survey team place your home on their network map.
Take the originals with you as well as copies when you visit an office. If a paper on the form's list is missing in your case, ask the staff what they accept instead, rather than guessing or paying someone to arrange it.
How to Apply, Step by Step
The two companies run the same basic process with small differences in where you hand in the form. Follow these steps in order.
- Get the application form. SSGC forms are available on ssgc.com.pk, in the SSGC Customer Connect app, and at any Customer Facilitation Centre. SNGPL forms are available on sngpl.com.pk and at its regional offices and Customer Care Centres, and SNGPL also accepts online submission of applications through its website.
- Fill the form and submit it with your documents. SSGC asks you to submit the filled form with your papers at the Customer Facilitation Centre for your area. SNGPL applicants submit at the regional office or Customer Care Centre, or online where that route is offered. Fill paper forms in capital letters, as the companies ask.
- Keep your acknowledgement receipt or reference number. When your application is accepted, you are given a receipt or a reference number for it. This is the most important paper in the whole process. Every status check, phone call and office visit about your application starts with this number, so store it safely and keep a photo of it on your phone.
- The company surveys your home. A company representative visits your premises in turn. The survey checks whether a gas pipeline is close enough, whether a connection is technically possible, and how the inside pipework, called the house line, should run. If your street has no pipeline yet, this is the step where that comes to light.
- You receive a demand notice. A demand notice, also called a proposal letter, is the company's official payment letter for your connection. It lists the security deposit and the service line charges worked out for your home. There is no fixed amount that fits everyone: the security depends on your expected gas use, and the service line charges depend on the length of pipe your home needs. The figures on your own notice are the only ones that count.
- Arrange the house line inside your home. The pipework inside your property is your own responsibility and your own cost. With the demand notice, SNGPL also gives a house line plan and a list of its registered house line contractors for your region, and you hire one of them to install and test the line. Using an enlisted contractor keeps the work to the standard the company will accept.
- Pay the demand notice at the bank. The notice names where to pay: the designated bank, or the official online channels the company allows. Pay exactly the amount printed on the notice, and keep the bank receipt safe. The company can ask to see that receipt at any time.
- The company installs the service line and the meter. After the payment and the house line are in place, the company lays its service line to your home and fits the meter. Connections are made available in turn, on a first come, first served basis, once every requirement is complete.
- The connection goes live and billing starts. Once the meter is running, your home has a gas account and monthly bills begin. Your first bill carries the account number you will use for everything from then on: the 10-digit Customer Number for SSGC, or the 11-digit Consumer Number, printed as Account ID, for SNGPL.
That last number deserves a moment of care. Every bill check, payment and complaint for the life of the connection uses it. Our guide on finding your gas customer number shows where it is printed and how to recover it if you ever lose it.
Where Each Company Handles Your Application
| SSGC | SNGPL | |
|---|---|---|
| Area served | Sindh and Balochistan | Punjab, Khyber Pakhtunkhwa, Islamabad and Azad Kashmir |
| Where you apply | Customer Facilitation Centre, with the form from ssgc.com.pk or the Customer Connect app | Online on sngpl.com.pk, or a regional office or Customer Care Centre |
| How you track | New Connection Status page on ssgc.com.pk, SMS updates, Customer Connect app | Application status on sngpl.com.pk with your reference details |
| Your account number later | 10-digit Customer Number | 11-digit Consumer Number, printed as Account ID |
| Helpline | 1199 | 1199 |
If you are unsure which office covers your home, call 1199 before you travel. The helpline serves both companies and can tell you the right centre for your address, which saves a wasted trip.
How to Track Your Application
A new connection is not quick, so tracking matters. You follow your application with the receipt or reference number from step 3 above, and each company gives you official ways to do it.
SSGC has a New Connection Status page on ssgc.com.pk. You enter the customer number printed on your application receipt and the page shows the current status. SSGC also sends status updates by SMS to the mobile number you wrote on your form, and updates appear in the SSGC Customer Connect app. If no SMS update reaches you within a week, SSGC's own form tells you to write to info.sales@ssgc.com.pk.
SNGPL applicants who applied online can check the application status on sngpl.com.pk using their reference details. If you applied on paper, your acknowledgement receipt is your key: take it to the Customer Care Centre or quote its number when you call.
For both companies, the 1199 helpline and a visit to the customer centre with your receipt remain the fallback when the online status has not moved. Ask what stage your file has reached and what, if anything, is still needed from your side. Sometimes a missing paper is the only thing holding a file, and one visit clears it.
Why Applications Wait, Honestly
It is better to hear this plainly at the start. There is no fixed date by which your connection must arrive. Files move in turn, and the queue in many areas is long, because a large number of people applied during the years when connections were paused.
Your connection also depends on things no form can change. The gas network must reach your street. Enough gas must be available in the system. And government policy decides whether new connections are being given at all, and on what terms, as the 2025 change from system gas to RLNG showed. A wait of months is common, and it does not mean your file is lost. It means you are in a queue that moves slowly for everyone.
The Agent Warning: Read This Before You Pay Anyone
Wherever people wait in a queue, middlemen appear promising to jump it. With gas connections the promise is always the same: pay cash, and your connection will come early. It is not true, and the companies say so themselves.
SNGPL publishes this warning on its own website: do not pay anything to any agent, tout or contractor to speed up the process, because it is a waste of your money and legally actionable, and a connection obtained that way can be removed. SNGPL also states that demand notice amounts are deposited in banks or official online channels only, and that no person, inside or outside its offices, is authorised to collect any amount from applicants in cash.
The rule that protects you is simple. The only payment a new connection ever needs is the amount printed on your demand notice, paid at the bank or the official channels named on it, against a proper receipt. If anyone asks you for cash in hand, for any reason connected with your application, the answer is no. Take your receipt number to the customer centre or call 1199 instead.
After Your Connection Goes Live
When the meter is fitted and gas is flowing, you are a regular customer like any other. Your first bill starts the monthly cycle, and it carries the account number that everything else depends on.
From then on, this site is built for you. Check any month's bill free with the SSGC bill checker or the SNGPL bill checker. Read our guide to gas bill charges explained so every line of the bill makes sense, remembering that an RLNG connection is priced at the RLNG rate rather than the slab rates. And after you pay, our guide on checking if your gas bill is paid shows how to confirm the money reached the company.
Keep your application receipt and your demand notice payment receipt even after the connection is live. Together they are the paper history of your connection, and they settle questions faster than anything else if a dispute ever arises.
